Routine maintenance works (change-outs) on the 6km petroleum pipelines from Tema Jetty to Tema oil refinery.
Client / Stakeholders: Ghana petroleum Mooring Systems (GPMS), Tema Oil Refinery
Project Duration:4 years and Ongoing (Routine).
Location: Tema
Project Summary: Le PELS Ghana has been the contractor of choice over the last 4 years providing maintenance services to the Ghana Petroleum Mooring Systems Limited who are the operators Tema Oil Refineries Pipelines. The pipelines consist a 6km run of 18″,14″,12″,10″,8″ and 6″ seamless carbon steel pipelines. Typical maintenance works involves procurement, fabrication and replacement of defective sections of the pipelines.
Over the Last 4 years, the team has cumulatively changed out about 1km of varying pipe sizes and various fittings as part of maintenance works on the pipelines under EPC contracts.